These were the challenges we faced as the general contractor of the Pioneer 360 Business Center in Arlington, Texas.
Demolition of an Existing Building and Recycling the Materials. The largest challenge faced during this project was the fact that the property was largely covered with an abandoned 800,000 SF, multi-story mall. http://avto45.comuf.com Adding to the complexity of this demolition, shortly after breaking ground, the developer found a buyer for the project. The buyer wanted to build the business center as a LEED-certified project. Along with significant design changes to the planned buildings, the conversion to a green building approach required significant changes to the mall demolition.
As part of the qualifications for LEED certification, we established a target of recycling 95% or more of materials taken from the http://postroj.webatu.com demolished mall rather than sending them to landfill. http://gidromolot.comli.com To ensure we stayed on track for this goal we had to manage the materials carefully as we pulled them from the building.
 
  • Страница 1 из 1
  • 1
Поиск:
Новый ответ
Имя:
Текст сообщения:
Опции сообщения:
Код безопасности:

Форма входа